To get started, wire Pins 1 and 3 (VBAT) to +12V or +24V and Pin 2 (GND) to Ground. Once power is applied, the default splash screen will be displayed, and will transition to the graphical user interface the Graphical User Interfaces (GUI) application.

Default Splash

...

Start-up Screen

The start-up Graphical User Interfaces (GUI) GUI will appear as shown below. These GUIs are configurable through our Studio Interface Kit (SIK)

...