Skip to end of banner
Go to start of banner

Installation Software & Test Fixture

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

The following procedure shall be used to load the necessary software to the workstation and provide designs to the test fixture. The intent of these test steps are to ensure the workstation is set up appropriately and the test fixture design is captured.

Sections

Install Flasher Tool to Workstation

  1. Install the ADIM-Flasher tool onto your workstation.

  2. Go through the setup wizard to successfully install it.

Install SIK to Workstation

  1. Install the Studio Interface Kit onto your workstation.

  2. Go through the setup wizard to successfully install it.

Test Fixture Setup

The following procedure will go through the design of the test fixture that is necessary to execute the manufacturing tests for EVIC.

Analog Inputs

Use x5 22k resistors in series, powered from 5V to generate different voltages for each channel.  See schematic below for wiring connector pins P4 and P5.

Digital Inputs and Outputs

Use x7 inverters on pins 1-7 on connector P3. The inverters are used to convert ground to 12V. No inverter is needed for pin 8. See schematic below for wiring connector pins P3 and P5.

CAN Channel

A test EVIC board is needed to transmit CAN messages onto the CAN lines of a production EVIC board. Each CAN line (High and Low) will need to be wired to both the Test and Production EVIC boards.

Test Fixture Example

  • No labels

0 Comments

You are not logged in. Any changes you make will be marked as anonymous. You may want to Log In if you already have an account.